Practical Introduction to the Safe Operation of High and Low Voltage Switchgear
Course code: S9
Introduction
This course is designed specifically for individuals with little or no previous experience in high voltage switching. It focuses on the practical (hands-on) element of switching and is predominately workshop rather than classroom based. This course should be undertaken as a pre-curser to the S4 and MAR4 'full authorisation' courses
Participants
Electrical/non-electrical personnel who require practical (hands-on) experience of switching high and low voltage switchgear prior to undertaking future authorisation courses.
Aim
To introduce personnel to the fundamental concepts of high voltage switching to enable them to familiarise themselves with operational protocols and potential physical constraints prior to receiving full authorisation training.
Outline Contents
- Operational procedures
- Single end drive motor isolations
- 11/3.3kV and 11/0.415kV transformer isolations
- Ring mains and ring mains unit
- Voltage transformer isolation
- Circuit main earth application protocols
- Additional earth application protocols
- Dependant power operations
- Independent power operations
- Stored energy operations
- Electrical safety documents
- Key safes and Multi Hasp locking (Isolok) systems
- Abridged high voltage safety rules
Certification
Candidates will receive a Faraday "Attendance" certificate which should be produced when attending a full authorisation course at a later date.
Course Duration
3 days
Course Dates
For courses undertaken at our UK training centre
- 12th - 14th Jan
- 26th - 28th Jan
- 9th - 11th Feb
- 23rd - 25th Feb
- 9th - 11th Mar
- 23rd - 25th Mar
- 13th - 15th Apr
- 27th - 29th Apr
- 11th - 13th May
- 25th - 27th May
- 15th - 17th Jun
- 13th - 15th Jul
- 27th - 29th Jul
- 10th - 12th Aug
- 24th - 26th Aug
- 14th - 16th Sep
- 28th - 30th Sep
- 12th - 14th Oct
- 26th - 28th Oct
- 9th - 11th Nov
- 30th Nov - 2nd Dec
- 7th - 9th Dec